Mr Scaffold goes to the Movies

Stepping up to play a part in the Movies

Our featured project of the month May 2012 was at Event Cinemas. They required some remedial work on a 6m ceiling, above a public access stairwell. This required after hours work, that need to installed and dismantled in a quick turnaround. Mr Scaffold working in conjunction with plasters and painters, was able to construct this
-> Continue reading Stepping up to play a part in the Movies

Mr Scaffold Aluminium Scaffolding

Keeping the Scaffold off the Street level

Project of the Month April 2012 Mr Scaffold’s project of the Month April 2012 was for this apartment block on Sydney’s Northern Beaches, that has commercial premises operating below. It is a busy area, and the owner’s wanted to ensure that scaffolding works didn’t affect pedestrian flow of traffic. Our lightweight and versatile KwikScaf made
-> Continue reading Keeping the Scaffold off the Street level

Mr Scaffold raises to 30m

Darling Point Paint Job

Project of the Month March 2012 If you have been travelling around Darling Point in the last few weeks you will have noticed the huge 10 storey building with the big Mr Scaffold sign on display. This building will take a total of 6 weeks labour, which in comparison to the 9 weeks it would
-> Continue reading Darling Point Paint Job

mrscaffold confined space

Triple Solution for Water Treatment Plant Maintenance

Project of the Month February 2012 One of Sydney’s biggest water treatment plants required maintenance and had the issue of how to gain access to the areas that required this attention. They called upon Mr Scaffold for a solution to their problem. Mr Scaffold Specialises in solutions for confined spaces, which was a necessity when
-> Continue reading Triple Solution for Water Treatment Plant Maintenance

Catch Platform for Roof Works when edge protection is not an option

Mr Scaffold was called upon for our Project of the Month January 2012, to provide a safe catch platform for roof works on a 6 story heritage building all without damaging the roof or any other part of this unique building. This job is actually part of an ongoing project and is the third stage
-> Continue reading Catch Platform for Roof Works when edge protection is not an option

Cantilevered bridge across walkway Sydney University

In our Project of the Month December 2011, one of Sydney’s biggest builders needed to limit public access to two busy walkways at Sydney University they called on Mr Scaffold to come up with a solution. At Mr Scaffold there is no job too big, small or complex that we cannot handle so we took
-> Continue reading Cantilevered bridge across walkway Sydney University

Mr Scaffold Aluminium Scaffolding

Bankstown Church Steeple Special Design for Repair Works

Project of the Month October 2011 The Uniting Church at Bankstown was requiring some repairs to the upper section of the steeple. This required a special design scaffold system to allow access by the contractors to make the repairs without touching or damaging the tiles. Mr Scaffold provided a highly skilled team and a fleet
-> Continue reading Bankstown Church Steeple Special Design for Repair Works

mr scaffold hotel roof demolition scaffolding

Scaffolding the Top without blocking the view

Project of the Month September 2011 This custom designed heavy duty scaffold was built for one of Australias largest building companies and yet again we were called upon to come up with an innovative solution.  For our Project of the Month September 2011, Mr Scaffold was asked to come up with a scaffolding solution for
-> Continue reading Scaffolding the Top without blocking the view

mr scaffold aluminium scaffolding across shopping centre void

Shopping Centre repair works require advanced scaffolding solution

Our Job of the Month December 2010 needed a customised scaffolding solution. Modern Shopping centres include large voids that extend through several floors, up to a light well, or well lit ceiling area.  It produces a feeling of spaciousness, natural light and comfort, reducing any claustrophobic feelings of large shopping centres with lots of stores
-> Continue reading Shopping Centre repair works require advanced scaffolding solution

Mr Scaffold Aluminium Scaffolding

Balmain East Wharf Scaffolding for Repair and Paint

Our featured Job Of The Month October 2010 was for this Cantilevered tube and fitting scaffold, at Balmain East Wharf in Sydney, was needed to access the outside frame of the wharf for painting. Mr Scaffold team had very strict guidelines for working hours and also maintaining access to the wharf at all times. A
-> Continue reading Balmain East Wharf Scaffolding for Repair and Paint

Mr Scaffold Aluminium Scaffolding

Job of the Month September 2010

  Our featured job of the Month September 2010 required scaffolding to be erected at Wollstonecraft on Sydney’s North Shore. The Strata / Body Corporate commissioned the works for remedial repairs, plastering, rendering and painting was required on the building. Mr. Scaffold provided guardmesh on the scaffold working levels to prevent debris from falling below
-> Continue reading Job of the Month September 2010

Mr Scaffold Aluminium Scaffolding

Iconic Manly Landmark receives the Mr Scaffold Treatment

Our featured Job of the Month June 2010 was at an iconic Sydney church situated on beautiful Manly Beach. Nicole Kidman and Keith Urban tied the knot at this famous landmark in Manly in 2003 because of it’s stunning architecture. Mr. Scaffold was the natural first choice to provide scaffolding and access solutions during the
-> Continue reading Iconic Manly Landmark receives the Mr Scaffold Treatment